Fort Weaver Road Reconstructed Sewer

City and County of Honolulu
Ewa Beach, Oahu, Hawaii

The Fort Weaver Reconstructed Sewer project called for the rehabilitation of over 6,000 linear feet of large diameter sewer line in the Ewa Beach area. Park Engineering provided the planning, engineering design and topographic survey services to install a cured-in-place-pipe (CIPP)  liner in the existing 24″, 30″ & 36″ trunk sewer.

logo_rev_40
COPYRIGHT © 2023 PAREN, INC. ALL RIGHTS RESERVED.

Log in with your credentials

Forgot your details?